Eight kitchens, six baths, three full pantries, and two butler's halls — most of them in homes built before 1930. Selected projects from the last two years, with notes on what was there before and what stayed.

A Cherokee Triangle Victorian kitchen with quartersawn oak cabinetry
Project 01 Cherokee Triangle · 2025

The Cherokee Victorian

A 1908 home brought back to working order. Original butler's pantry restored, quartersawn oak cabinetry, twelve feet of single-slab honed Calacatta, unlacquered brass. Eleven weeks.

A Highlands primary bathroom with a freestanding tub and zellige tile
Project 02 The Highlands · 2025

The Highlands Primary

A primary bath taken from a 1990s renovation to something quieter and more correct for the 1924 Craftsman it sits inside. Zellige tile, walnut vanity, soapstone counters. Five weeks.

A Crescent Hill kitchen with white shaker cabinetry and dark counters
Project 03 Crescent Hill · 2024

The Crescent Hill Bungalow

A 1920s bungalow kitchen where the original footprint was right but the cabinetry had been cycled three times in fifty years. We rebuilt to last. Inset shaker, honed soapstone, original floors refinished. Nine weeks.

A small powder room with marble and brass fixtures
Project 04 Old Louisville · 2024

The Old Louisville Powder

The smallest project we did in 2024 and one we're most proud of. A 24-square-foot powder room treated like the showpiece it is. Hand-painted English tile, wall-mount brass, marble basin. Three weeks.

A St. Matthews kitchen with island and pendant lighting
Project 05 St. Matthews · 2024

The St. Matthews Family Kitchen

A working kitchen for a family of five — designed around how this family cooks, not around what looks best on Instagram. Painted inset cabinetry, butcher block prep zone, marble at the range, durable matte porcelain underfoot. Ten weeks.

A guest bath with checker floor tile and a wall-mount sink
Project 06 New Albany · 2024

The New Albany Hall Bath

A 1912 Federal returned to period correctness — checker marble floor, wall-mount sink, period-correct chrome fixtures, plaster walls patched and skim-coated. Four weeks.

By the numbers

Eight to twelve weeks
per kitchen. Four to six per bath.

Every project in this portfolio finished within the schedule we wrote on day one. Most finished a few days early. None ran over by more than a week — and on the two that did, we credited the overrun back.

14
Projects this year
2 wk
Average bath start-to-end
10 wk
Average kitchen start-to-end
100%
On schedule or early

Kitchen & Bath

Your project
could be next.

Mike visits within a week and you'll have a concept document inside fourteen days. The visit is free, the concept document is free, and we don't take a deposit until the final scope is signed.